Brief history of Lean PDF Print E-mail
Article Index
Brief history of Lean
Page 2
Page 3
All Pages
 
Henry Ford
 
The first person to truly integrate an entire production process was Henry Ford. At Highland Park, MI, in 1913 he married consistently interchangeable parts with standard work and moving conveyance to create what he called flow production.The public grasped this in the dramatic form of the moving assembly line, but from the standpoint of the manufacturing engineer the breakthroughs actually went much further.

Ford lined up fabrication steps in process sequence wherever possible using special-purpose machines and go/no-go gauges to fabricate and assemble the components going into the vehicle within a few minutes, and deliver perfectly fitting components directly to line-side. This was a truly revolutionary break from the shop practices of the American System that consisted of general-purpose machines grouped by process, which made parts that eventually found their way into finished products after a good bit of tinkering (fitting) in subassembly and final assembly.

 Model-T PlantThe problem with Ford’s system was not the flow. He was able to turn the inventories of the entire company every few days. Rather it was his inability to provide variety. The Model T was not just limited to one color. It was also limited to one specification so that all Model T chassis were essentially identical up through the end of production in 1926.  Indeed, it appears that practically every machine in the Ford Motor Company worked on a single part number, and there were essentially no changeovers. When the world wanted variety Ford seemed to lose his way. Other automakers responded to the need for many models, each with many options, but with production systems whose design and fabrication steps regressed toward process areas with much longer throughput times. Over time they populated their fabrication shops with larger and larger machines that ran faster and faster, apparently lowering costs per process step, but continually increasing throughput times and inventories.
 © Lean Enterprise Institute, USA. Reproduced here with permission


 